A DND spare parts tender I worked on had several lines coded QAC Q. The tender didn't ask for ISO registration. But it did ask for a quality system that follows ISO 9001:2015, and the government's quality representative could visit us and our suppliers.
So I wrote a short quality manual, scoped to what a reseller actually does.
What QAC Q asks for
Reading a DND spare parts tender decodes the quality codes. For Q, the standard clause is D5540C, from the archived Standard Acquisition Clauses and Conditions manual that DND tenders still cite. It says:
- The contractor must comply with ISO 9001:2015.
- It is not intended that the contractor be registered to ISO 9001. But the quality management system must address all requirements appropriate to the scope of the work.
- The government's quality assurance representative (QAR) has the right of access to the contractor's sites, and to the sites of its subcontractors and suppliers.
- The contractor must tell the QAR about non-conforming product received from a subcontractor or supplier, when that product has been subject to government quality assurance.
"Appropriate to the scope of the work" is the key phrase. A reseller doesn't design or make anything. Its quality system is about buying the right part from the right source and proving it.
Some contracts also include a separate quality plan clause, D5402C. It asks for a plan prepared according to ISO 10005:2018, due a set number of days after the contract starts. If your contract has it, that's a second document.
What a reseller's manual can cover
Mine is short. It covers:
- Scope. What the company does: buys parts from manufacturers and distributors and resells them. What it doesn't do: design, make or repair.
- Buying from traceable sources. Buy from the manufacturer or its authorized distributors where you can. Record who you bought from and why.
- Receiving inspection. When parts arrive: check the part number, the quantity, the condition and the paperwork against the order.
- Certificates of conformity. Ask for the supplier's certificate on the purchase order. Keep it with the order.
- Records. Where each record lives and how long you keep it.
- Non-conforming parts. What happens when a part is wrong: set it aside, label it, tell the supplier, and tell the QAR when the clause requires it.
- Who is responsible. In a one-person company, that's the owner. Say so.
The forms
A few simple forms make it real:
- A supplier list, with how each one was checked.
- A receiving inspection checklist.
- A non-conforming parts log.
- A record index.
Records to keep
Keep what proves you did what the manual says: purchase orders, supplier certificates, receiving checklists, delivery records and any non-conformance notes.
For QAC C lines, the clause D5545C is specific: keep accurate and complete inspection records, and make them available to DND for one year after the contract ends. Keeping the same records for Q lines makes sense too.
Be honest
- Don't claim ISO 9001 certification. You aren't certified. Say your quality system follows ISO 9001:2015 for the scope of reselling.
- Write what you actually do. If the QAR visits, they compare the manual with what they see. A short manual you follow beats a long one you don't.
- Sign it before you bid. The owner signs the manual before any Q line is bid. Then it's in place, not a promise.
CPCSC Level 1 is another short set of written rules a small company can put in place before it bids on defence work.