All posts

Reading an RFP, mandatory criteria, lowest price compliant and equivalent part numbers

Most federal bids are lost before price is ever looked at. A missed requirement ends the evaluation. This post covers three things to read first in any solicitation.

Mandatory criteria are pass or fail

The Treasury Board Secretariat describes mandatory criteria as the minimum requirements essential to the work. They are scored pass or fail. A bid that does not meet them gets no further consideration.

PSPC puts it the same way: you must fulfill all mandatory criteria to move forward in the evaluation.

What this means in practice:

  • Find every "must", "shall" and "mandatory" in the document.
  • Put each one in a checklist with the page where you answer it.
  • Answer each criterion directly. Do not make the evaluator search for proof.
  • Follow the format the solicitation stipulates.
  • Include every required signed certification.

What "lowest price compliant" means

Under the method called lowest evaluated price with mandatory requirements only, compliant bids are then chosen against price. Put simply: pass every mandatory requirement, and the lowest price among the passing bids wins.

There is a variant that also has point-rated criteria. There, the winner is the lowest price among bids that pass both the mandatory requirements and the minimum score.

Two points follow:

  • Meeting the requirement exactly is enough. Extra features do not earn points under this method.
  • Compliance is the whole game. A low price on a non-compliant bid is worth nothing.

The solicitation names its basis of selection. Find that section early.

Pass first, then price

How "lowest price compliant" picks a winner

Five made-up bids. The cheapest one does not win.

  1. Bid A$9,800Step 1Fail. A required certification is not signedStep 2Out. Its price is never compared.
  2. Bid B$10,400Step 1Pass. Meets every mandatory criterionStep 2Lowest compliant price. Wins.
  3. Bid C$10,150Step 1Fail. Offers a different part number with no equivalency explainedStep 2Out. Its price is never compared.
  4. Bid D$11,900Step 1Pass. Meets every mandatory criterionStep 2Compliant, but a higher price
  5. Bid E$12,300Step 1Pass. Meets them, plus extra features that earn nothing hereStep 2Compliant, but a higher price

Equivalent or replacement part numbers

For goods, the solicitation may name a brand, model or part number. Whether you can offer something else depends on its wording.

  • Some solicitations say bidders must supply the exact item described, and that substitutes will not be considered.
  • Others include language that allows equivalent products and says how equivalency is judged.
  • If the document is silent or unclear, ask the contracting authority a written question before the closing date, using the communication method the solicitation sets out.

When equivalents are allowed, do not assume. State the part number you are offering, say why it meets the requirement, and attach the documents the solicitation asks for. If a part number has been replaced by the manufacturer, say so and give the new number.

Watch for amendments

You are responsible for tracking amendments. They can change requirements and closing dates. Read each one against your checklist.

Before you submit

  • Every mandatory criterion has a clear answer.
  • Part numbers match the solicitation, or the equivalency is explained.
  • Certifications are signed and complete.
  • The closing date, time and submission method are confirmed.
  • Your questions were sent in writing, on time.

Official sources