All posts

Changing your price after you submit

After I submitted one offer, I needed to raise a price. The tender didn't explain how to change a submitted bid. A quick email with only the new price felt risky. It could be read as an incomplete bid, or ignored.

So I sent a complete new offer instead.

What the rules allow

Before closing, you can usually change a bid:

  • SAP Business Network. CanadaBuys says you can revise your response up to the deadline, even after you submit, with the "Revise Response" button. Don't submit a second bid for the same opportunity.
  • Canada Post Connect. CanadaBuys says changes or revisions can be made through the first conversation, without opening a new one.
  • The archived Supply Manual says bids may normally be modified, withdrawn or resubmitted before closing if it is done in writing.

After closing, you can't change your price.

Replacement, not a patch

When the solicitation doesn't say how to change a bid, I send a replacement, not a patch.

  • A patch is a message that changes one number: "Line 3 is now $X." The evaluator has to merge it with your first bid. It may not be signed the same way. It can be missed.
  • A replacement is a complete new offer: every form, every price, freshly signed and dated, with a short note that it replaces the earlier one.

A replacement leaves no doubt about what your offer is.

How I did it

  1. Prepared a complete new offer, with every line, not just the changed one.
  2. Signed and dated the offer form again.
  3. Added a one-line cover note.
  4. Sent it before closing.

The cover note:

This offer, dated [date], replaces in full our offer for solicitation [number] submitted on [earlier date]. Please evaluate this offer only.

Watch the details

  • Signatures. If the first bid needed a signature, so does the replacement.
  • Every mandatory item. A replacement has to pass the same mandatory criteria. Include every certification and form again.
  • The same channel. Use the same conversation on Connect, or Revise Response on SAP Business Network.
  • Time. Leave room before closing. A replacement that arrives late is a late bid.

Withdrawing a submitted bid covers backing out completely. Submitting a bid with Canada Post Connect covers the Connect steps.

If you're starting out, do this next

  • In your next solicitation, look for how changes to a submitted bid are handled.
  • If you need to change a price, send a complete, signed replacement, not a one-line email.
  • Use the same channel as the first bid.
  • Save both versions and proof of when each was sent.

Official sources

Sources checked on .