Asking the buyer a question: when, how, and what happens next

A short, clear question to the buyer has saved me real work. One answer told me two lines had no drawings, so I skipped them. Another settled how many licences a line meant.

You only get a short window to ask.

Who to ask

Questions go to the contracting authority named in the solicitation, and only to them. The federal standard instructions that many solicitations use, called 2003, say enquiries go only to the contracting authority. Don't ask the end user, a technical contact you found yourself or the bid receiving unit. The 2003 instructions warn that this can get your bid declared non-responsive.

When

Each solicitation sets its own deadline for questions. Look for it near the closing date.

  • In the federal tenders I saw, it was around five business days before closing.
  • Shared Services Canada's standard instructions, version 1.4, say no later than 10 federal government working days before closing.

Questions that arrive after the deadline may not be answered. Find the date the day you start reading.

Read everything first

Before you write, read the whole solicitation, every annex and every amendment. Once I dropped a question after re-reading every document and finding the answer myself. A question the documents already answer wastes your time and the buyer's.

How to write it

  • One question per item. Number them if you have several.
  • Point to the place. SSC's standard instructions ask bidders to reference, as accurately as possible, the numbered item of the solicitation. Give the section, the page or the line number.
  • Quote the words. Copy the sentence you are asking about.
  • Ask something they can answer yes or no, or with a number.
  • Use the method the solicitation names, usually an email address.

A sample: "Re: Line 4, Annex A. The line lists a part number but no drawing. Is a drawing available for this item, or should bidders quote the part number as listed?"

What happens next

The answer comes back to everyone, not just you. CanadaBuys says the contracting officer issues an amendment to the bidding details so that all bidders have the same information. Public Services and Procurement Canada says answers to questions appear as amendments on the tender notice page.

So:

  • Follow the notice on CanadaBuys, so you get an alert when an amendment is posted.
  • Read every amendment. In the tenders I saw, answers sometimes took a few days.
  • Treat the answer as part of the solicitation. Update your checklist.

Don't put anything in a question you wouldn't want other bidders to read. Assume every bidder will see it.

When the buyer phones

Once a buyer phoned me about a bid. Be polite and brief, and take notes. If anything they say changes what you would bid, ask them to confirm it in writing, so it is in the record for everyone.

Spare parts tenders raise a lot of questions about lines and drawings. Reading a DND spare parts tender decodes them. Reading an RFP covers the mandatory criteria worth asking about.

If you're starting out, do this next

  • On your next solicitation, find the question deadline and put it in your calendar.
  • Read the whole document and every amendment before you write a question.
  • Write each question as one line, with the section or line number and the words you are asking about.
  • Follow the notice on CanadaBuys so you see the answer.